Coordination Problems in Multiple Scrum Teams
When multiple Scrum Teams work on the same code base, coordination problems and mutual dependencies can arise. This article explores a specific exam question about whether these issues can be fully addressed with a comprehensive branching and merging model in the version control tool, providing detailed explanations and insights relevant to the PSM II exam.
Exam Question
You are working with multiple Scrum Teams that are working in the same code base. They suffer from coordination problems and mutual dependencies. True or False: This can be fully addressed with a comprehensive branching and merging model in the version control tool. (choose the best answer)
- A. True
- B. False
Correct Answer
B. False
Explanation
Correct Answer
B. False: While a comprehensive branching and merging model in the version control tool can help manage some aspects of coordination and dependencies, it cannot fully address the underlying issues. Coordination problems and dependencies often stem from broader challenges such as communication, collaboration, integration practices, and alignment of work between teams. Effective coordination requires a combination of technical practices, process adjustments, and cultural changes.
Why A is Incorrect
A. True: This answer is incorrect because relying solely on a branching and merging model overlooks other critical aspects needed to address coordination problems. While version control tools are essential, they are not sufficient on their own to ensure effective collaboration and integration across multiple teams.
Responsibilities in Scrum
- Product Owner: The Product Owner should ensure that the Product Backlog is well-organized and that dependencies are identified and managed. They play a key role in aligning the work of multiple teams towards a common goal.
- Scrum Master: The Scrum Master facilitates collaboration and communication between teams. They help identify and resolve coordination issues and promote practices that support effective teamwork and integration.
- Developers: Developers need to work closely with each other, across teams, to manage dependencies and ensure seamless integration of their work. They should adopt practices such as continuous integration, regular cross-team meetings, and shared code reviews.
Relevance to the PSM II Exam
Understanding the limitations of technical solutions in addressing coordination problems is crucial for the PSM II exam. It demonstrates advanced knowledge of Scrum principles and the ability of the Scrum Master to guide multiple teams in effective collaboration. Mastering this concept ensures that Scrum Masters can support their teams in overcoming coordination challenges and delivering high-quality products.
Key Takeaways
- A comprehensive branching and merging model is helpful but not sufficient to fully address coordination problems and dependencies in multiple Scrum Teams.
- Effective coordination requires a combination of technical practices, process adjustments, and cultural changes.
- Scrum Masters play a critical role in facilitating collaboration and resolving coordination issues.
Conclusion
Addressing coordination problems and mutual dependencies in multiple Scrum Teams requires more than just a technical solution. While a comprehensive branching and merging model in the version control tool can help, it is essential to adopt a holistic approach that includes effective communication, collaboration, and integration practices. Understanding these principles is crucial for effective Scrum implementation and success in the PSM II exam.

Get ready for the official PSM II exam
90 PSM II practice questions, each with an in-depth explanation like the one above.
- Practice Mode: study at your own pace and choose the test length.
- Mock Exam Mode: 30 random questions in 90 minutes, like the real exam.
$29 is ScrumPrep's one-time price. The official PSM II exam fee ($250) is paid separately to Scrum.org.
More PSM II exam questions
- Which two statements are the most accurate in regards to scaling Scrum for large projects that require multiple Scrum Teams?
- Your Scrum Team has been working together for over a dozen Sprints. The Scrum Team consists of 10 members. Each Sprint takes four weeks. As a Scrum Master, you observe that the Developers are hardly collaborating; during the Sprint, members are working on their own items. You also notice that the items on the Sprint Backlog are mostly unrelated. You suspect that the lack of a Sprint Goal might be the cause.
- Where should the Daily Scrum be held according to the Scrum Guide?
- In the Sprint Retrospective, there is discussion that the quality of the Increment is not sufficient for going to production. In response, a Scrum Team member points out the high velocity reached by the team. What are the two best actions for the Scrum Master to take?
- True or False: Using Scrum ensures that adding more resources to a product delivery effort proportionally increases the value delivered.” (PSM II)