Scrum expects a new, Done Increment at least by the end of every Sprint. There is no release Sprint, separate acceptance phase or multi-Sprint cycle before an Increment exists.
Exam Question
For the purpose of transparency, when does Scrum say a new Increment must be done?
(choose the best answer)
A. Before the release Sprint.
B. After the acceptance testing phase.
C. At the end of every Sprint.
D. Every 3 Sprints.
E. When the Product Owner asks to create one.
Correct Answer
C. At the end of every Sprint.
Why This Is the Correct Answer
Transparency in Scrum depends on regularly inspecting real, working product. The Scrum Guide says the entire Scrum Team is accountable for creating a valuable, useful Increment every Sprint. It also notes that multiple Increments may be created within a Sprint, and that the sum of them is presented at the Sprint Review. So the end of the Sprint is the latest point, not the only one. Waiting for a release Sprint, a testing phase or several Sprints would leave long stretches where nobody can see the true state of the product. Frequent Done Increments keep risk visible and let the Product Owner decide when to release.
Why the Other Options Are Wrong
A. Before the release Sprint. Release Sprints are not part of Scrum. Every Sprint already produces releasable work.
B. After the acceptance testing phase. Scrum has no separate testing phase. Testing is part of meeting the Definition of Done within the Sprint.
D. Every 3 Sprints. An Increment is required every Sprint, not every few Sprints.
E. When the Product Owner asks for one. The Product Owner decides when to release, but creating a Done Increment is not optional and does not wait for a request.
Exam Tip
Questions about when an Increment must exist always point to every Sprint. Options mentioning phases or special Sprints come from traditional project thinking.
Key Takeaways
- A Done Increment is required every Sprint.
- Several Increments may be created within one Sprint.
- Phases and release Sprints are not part of Scrum.

Get ready for the official PSPO II exam
120 PSPO II practice questions, each with an in-depth explanation like the one above.
- Practice Mode: study at your own pace and choose the test length.
- Mock Exam Mode: 40 random questions in 60 minutes, like the real exam.
$29 is ScrumPrep's one-time price. The official PSPO II exam fee ($250) is paid separately to Scrum.org.
More PSPO II exam questions
- What is the role of the Product Owner in crafting the Sprint Goal?
- You work for a large financial institution. Your products have many interdependencies: you have mobile, web, and ATM product interfaces to financial products like savings, checking, credit card, investments. When any of these financial products change, the changes ripple throughout the mobile, web, and ATM clients, and maintaining consistency is challenging. What should you do to reduce this problem?
- Who is accountable for maintaining and communicating the Product Goal?
- If a Product Owner finds themselves with more work to do than they can give attention to, what strategy can help them achieve the things that need to be done?
- What are the accountabilities of a Tester on a Scrum Team?