Answering: “Scrum is based on empiricism. All of its artifacts must be transparent to ensure sufficient accuracy of inspection. How can the Scrum Team maintain the Product Backlog to maximize its transparency?”

Scrum is based on empiricism. All of its artifacts must be transparent to ensure sufficient accuracy of inspection. How can the Scrum Team maintain the Product Backlog to maximize its transparency?
(choose the best answer)
A. The Product Backlog items must be sized such that the highest ordered items are no bigger than a Sprint.
B. Product Backlog is only updated at the Sprint Review, when both the Scrum Team and the stakeholders are available.
C. Product Backlog is only updated at a release planning meeting with the stakeholders and the change control board present.
D. The Product Backlog is continually kept up to date with the most recent insights.
E. Product Backlog items should hold no more than 8 points of work, which is average in the range of acceptable sizes of 1, 2, 3, 5, 8 and 13.

Answering: “Scrum is based on empiricism. All of its artifacts must be transparent to ensure sufficient accuracy of inspection. How can the Scrum Team maintain the Product Backlog to maximize its transparency?” Read More »

Answering: “Which statement best describes the Sprint Review?”

Which statement best describes the Sprint Review?
(choose the best answer)
A. It is a mechanism to control the Developers activities during a Sprint.
B. It is a demo at the end of the Sprint for everyone in the organization to check on the work done.
C. It is when the Scrum Team and stakeholders inspect the outcome of a Sprint and figure out what to do next.
D. It is used to congratulate the Developers if they complete their forecast or to punish the Developers if they fail to meet their forecast.

Answering: “Which statement best describes the Sprint Review?” Read More »

Answering: “What are two effective ways for the Scrum Team to make non-functional requirements visible?”

What are two effective ways for the Scrum Team to make non-functional requirements visible?
(choose the best two answers)
A. Add them to the Product Backlog to ensure transparency.
B. Add them to the Definition of Done so work is taken care of every Sprint.
C. Put them on a separate list on the Scrum board, available for all to see.
D. Run the integration and regression tests before the end of the Sprint, and capture the open work for the Sprint Backlog of the next Sprint.

Answering: “What are two effective ways for the Scrum Team to make non-functional requirements visible?” Read More »