False. The Product Owner does not need a fully documented Product Backlog before the first Sprint. It only needs enough well-understood items to give the team a valuable first Sprint.
Exam Question
True or False: The Product Owner should have the entire Product Backlog documented in detail before the first Sprint can start?
- A. True
- B. False
Correct Answer
B. False
Why This Is the Correct Answer
The Scrum Guide calls the Product Backlog “an emergent, ordered list of what is needed to improve the product.” Emergent means it changes and grows as the team and stakeholders learn. Items near the top get refined into smaller, more precise pieces, while items further down stay rough until they are needed. Writing everything in detail up front wastes effort, because much of that detail will be wrong or irrelevant once real feedback arrives. To start the first Sprint, the Scrum Team only needs enough ready items for Sprint Planning and a Product Goal to work toward.
Why the Other Options Are Wrong
A. True This treats Scrum like a waterfall project with a requirements phase. It delays value and ignores what will be learned from early Increments.
Exam Tip
Any statement that something must be complete, fully detailed or approved before the first Sprint is almost always false in Scrum.
Key Takeaways
- The Product Backlog is emergent.
- Only items near the top need detail.
- The first Sprint needs enough ready work, not a complete backlog.

Get ready for the official PSM I exam
480 PSM I practice questions, each with an in-depth explanation like the one above.
- Practice Mode: study at your own pace and choose the test length.
- Mock Exam Mode: 80 random questions in 60 minutes, like the real exam.
$29 is ScrumPrep's one-time price. The official PSM I exam fee ($200) is paid separately to Scrum.org.
More PSM I exam questions
- Scrum is based on empiricism. All of its artifacts must be transparent to ensure sufficient accuracy of inspection. How can the Scrum Team maintain the Product Backlog to maximize its transparency?” (PSM I)
- What are two effective ways for the Scrum Team to make non-functional requirements visible?
- If Product Backlog refinement is needed, when is the ideal time for refinement to take place and who should participate?” (PSM I)
- True of False: When there are multiple teams working on one product, each Scrum Team should have a separate Product Owner.” (PSM I)
- Scrum is based on empiricism. All Scrum artifacts must be transparent to ensure sufficient accuracy of inspection. Which two measures ensure that the Product Backlog is transparent?